One of the first contracts undertaken by CMH when formed in 1988 was to supply a glass batching plant for Dartington Crystal at their Torrington factory which included a new sand storage silo and conveying system, sack tipping stations and feeders for micro ingredients, a cullet handling system and a planetary mixer.
Since then we have completed two contracts in Egypt for Asfour Crystal, a high end crystal chandelier manufacturer, one being an automated glass batching plant and the other a fluid bed sand dryer which ensures a consistent moisture content, something that was detracting from the quality of the Crystal production system.
Monday – Friday
8.30am – 5.00pm